Figure 3-11 Position of the water tank
(1) Water pan (2) Water tank (3) High and low oats
Figure 3-12 Positions of high and low oats
(1) High
oats (2) Low oats
Procedure
Step 1 Loosen the two buttery nuts from the high and low oats in the water tank, and
remove the transport fasteners for the oats.
Step 2 Secure the buttery nuts.
Step 3 Connect the wiring terminals to the high
oat. The wiring terminals must be xed
higher than the water pan. Otherwise, water may drop into the wiring terminals.
NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm Width) 3 Installation Guide
Issue 17 (2020-10-22) Copyright © Huawei Technologies Co., Ltd. 40