Gas Connect Consoles
94 810410 Field Service Bulletin XPR170
20. Use a solution of soap and water or another liquid leak detector to look for gas leaks along the
mixer module gas lines. If you find a leak, disconnect and connect the bad connection or
connections.
21. Install the top panel.
22. Supply the power to the cutting system.
23. Do a system-wide test for gas leaks. If you find a leak, repeat the steps to install the replacement
mixer module. Refer to Install the mixer module on page 90. Repeat the installation steps and
test for system leaks until there are no leaks.
If a leak cannot be found or stopped, contact your cutting machine
supplier or regional Hypertherm Technical Service Team.