Interroll 24-V/48-V Roller Conveyor
RM 8310/8310 DF, RM 8320/8320 DF, RM 8330/8330 DF
Maintenance and repair
Version 1.5 (07/2020) en
Translation of original operating instructions
59
Requirement:
R The module is shut down.
4 Remove side frame cover (2).
4 Unscrew the fastening screws (3) of the roller.
4 Slightly turn roller (1) horizontally.
4 Remove drive belt from roller.
4 Remove the roller.
4 Install the new roller in reverse order.