EasyManua.ls Logo

INVT GD200-037G/045P-4 - Further Information; Product and Service Inquiries; Manual Feedback; Document Library on the Internet

INVT GD200-037G/045P-4
266 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Goodrive200 inverters
Appendix C
263
C.9 Other optional parts
No.
Optional
part
Instruction
Picture
1
Flange
installation
bracket
Needed for the flange installation of
1.5~30kW inverters
Not needed for the flange installation
of 37~200kW inverters
2
Installation
base
Optimal for 220~315kW inverters
An input AC/DC reactor and output
AC reactor can be put in the base.
3
Installation
bracket
Use the screw or installation bracket
to fix the external keypad.
Optimal for 1.5~30kW inverters ands
standard for 37~500kW inverters
4 Side cover
Protect the internal circuit in serious
environment. Derate when selecting
the cover. Please contact INVT for
detailed information.
5 Keypad
Support several languages,
parameters copy, high-definition
display and the installation
dimension is compatible with the
LED keypad.

Table of Contents

Related product manuals