EasyManua.ls Logo

jcb 426 - Page 87

jcb 426
226 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Working with the Machine
75 75
9811-3400-4
Loading a Truck
T2-004_2
Put the truck(s) at an angle of about 45° to the pile, as
shown. This cuts out unnecessary manoeuvring. Allow
enough distance for the shovel to reach its unloading
height while you are travelling, without slowing down.
Keep the wind on your back. This keeps dust away from
you and your machine.
Move your machine as close as possible to the truck
before unloading.
If the truck body is about as long as a shovel's width, tip the
load into the centre of the truck. If the truck is two shovel-
widths long or more, load the front of the truck first.
Do not dump the material in one sudden movement. Roll
the shovel forward in stages until it is empty. Use the
control lever to rock the shovel back and forth to loosen
any sticky material.
145500-2
Fig 50.

Table of Contents

Related product manuals