EasyManua.ls Logo

Juniper SRX100 - Page 48

Juniper SRX100
154 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 15: Required Tools and Parts for Installing and Maintaining the SRX100 Services Gateway (continued)
Related TopicTools and PartsTask
Packing the SRX100 Services Gateway
and Components for Shipment on page
126
Electrostatic bag or antistatic mat,
for each component
Electrostatic discharge (ESD)
grounding wrist strap
Flat-blade screwdriver,
approximately 1/4 in (6 mm)
Phillips (+) screwdrivers, numbers
1 and 2
Packing the SRX100 Services Gateway
Related Topics Unpacking the SRX100 Services Gateway on page 31
Installing the SRX100 Services Gateway in a Rack on page 40
Installing the SRX100 Services Gateway on a Desk on page 42
Installing the SRX100 Services Gateway on a Wall on page 43
Grounding the SRX100 Services Gateway on page 47
Connecting the SRX100 Services Gateway to the Power Supply on page 45
Packing the SRX100 Services Gateway and Components for Shipment on page
126
30 Required Tools and Parts for Installing and Maintaining the SRX100 Services Gateway
SRX100 Services Gateway Hardware Guide

Table of Contents

Other manuals for Juniper SRX100

Related product manuals