EasyManua.ls Logo

LELY JUNO 150 - Testing Procedures

LELY JUNO 150
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-2 Test and Adjustment
D-I012.1109EN
innovators in agriculture
4. Select Beepfreq route and push [ ].
5. Select the route you want to modify and push [
].
6. Push [
] or [ ] to modify the number of beeps per second.
Note:
The standard value 0.5 equals one beep per two seconds.
7. Push [ESC] to confirm and go one level up.
8.2.4 Modify the Beep Length
1. Get the E-Link Manual Controller (page 6-2).
2. Push [ESC] or [
] to wake up the E-Link.
3. In the main menu of the E-Link, select Settings and push [
].
4. Select Beep length.
5. Push [
] or [ ] to modify the length.
Note:
The standard value is 200 mSec.
6. Push [ESC] to confirm and go one level up.
8.2.5 Modify the Feed Push Power
1. Get the E-Link Manual Controller (page 6-2).
2. Push [ESC] or [
] to wake up the E-Link.
3. In the main menu of the E-Link, select Settings and push [
].
4. Select Feed push power.
5. Push [
] or [ ] to modify the power (page 4-24).
6. Push [ESC] to confirm and go one level up.
8.3 Tests
8.3.1 Analyse the Reliability of a Route
1. Get the E-Link Manual Controller (page 6-2).
2. Push [ESC] or [
] to wake up the E-Link.
3. Stop all timed actions (page 6-13).
4. In the main menu of the E-Link, select Routes and push [
].
5. Select 'Route analysis' and push [
].
6. Select 'Fail. problty' and push [ ].

Table of Contents

Other manuals for LELY JUNO 150

Related product manuals