EasyManua.ls Logo

LELY JUNO 150 - Managing Timed Actions and Manual Routes

LELY JUNO 150
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Instructions 6-13
D-I012.1109EN
innovators in agriculture
11. If you want:
To add another route to the time path, push soft button [New]
and repeat steps 7 to 11
Confirm an go up one level, push [ESC].
12. Push soft button [Yes] to save the new time path.
6.7.10 Make or Restore a Backup
Note:
Make a backup each time you changed a route or time path or installed a new
E-Link.
Backups are made on the E-Link.
1. Stop all timed actions (page 6-13).
2. In the main menu of the E-Link, select Routes and push [ ].
3. Select Backup route and push [ ].
4. Push soft button [Bckup].
5. Push soft button [Yes].
6. Wait until the process ends with a beep.
Note:
A backup can be restored by a Lely certified technician.
6.8 Start or Stop Timed Actions
1. Get the E-Link Manual Controller (page 6-2).
2. Push [ESC] or [
] to wake up the E-Link.
3. In the main menu of the E-Link, select Work and push [
].
Note:
If the pane on the upper side of the menu, that displays the actual time, is
grayed out, the timed actions are ON.
4. Push [START/STOP].
Figure 41. Start or stop timed actions

Table of Contents

Other manuals for LELY JUNO 150

Related product manuals