EasyManua.ls Logo

LELY JUNO 150 - General Operation Procedures

LELY JUNO 150
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-26 Description and Operation
D-I012.1109EN
innovators in agriculture
4.3.5 Service
The menu Service has the following submenus:
Hour counter to display the hours in use since the last counter reset
(only used by a service technician)
Version to display the software version
Installation 1 to install and test the JUNO 150 (only used by a service
technician)
Installation 2 to install and test the JUNO 150 (for development
purposes only)
Test Service to test the JUNO 150 (for development purposes only).
4.4 Operation
4.4.1 Routes, Actions, Manual Routes and Time Paths
Actions make a route
The JUNO 150 drives through a barn along a programmed route. A route
is built up of actions like 'Strip follow ' or 'Turn L <--'. A route always
starts and ends at the charging station. Refer to the following example
figure (fig. 21, page 4-26).
Automatic feed pushing with a time path
The JUNO 150 pushes the feed each day automatically on the same time
if a time path is set.
Manual feed pushing with manual routes
It is useful to enable 'MANUAL ROUTE'. You then can push a part of the
feed whenever you want to test a route (page 4-14). It is also useful to
program routes from different points in the barn back to the charging
station.
Figure 21. Actions make a route
KEY:
1. Strip follow - 2. Turn R --> - 3. Straight -4. Turn R --> - 5. Feed push L - 6. Straight - 7.
Feed push L - 8. Turn R --> - 9. Straight - 10. Turn R --> - 11. Feed push L - 12. Charger strip

Table of Contents

Other manuals for LELY JUNO 150

Related product manuals