EasyManua.ls Logo

LELY JUNO 150 - Time Path Setup and Backup Procedures

LELY JUNO 150
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-12 Operating Instructions
D-I012.1109EN
innovators in agriculture
6. Do the previous steps if you want to add another feed group
to this feed push action.
Note:
The total length of the feed groups must be equal to the length of the feed
push action.
12. Push [ESC] and push soft button [save].
6.7.8 Define the Push Power for a Feed Group
1. Connect the E-Link Manual Controller.
2. Push [ESC] or [
] to wake-up the E-Link.
Note:
The E-Link Manual Controller automatically goes into sleep mode when it is
not used for 10 minutes.
3. Stop all timed actions (page 6-13).
4. In the main menu of the E-Link, select 'Routes' and push [
].
5. Select 'push power' and push [
].
6. Select the applicable feed group and push [
].
7. Select the applicable push power and push [
].
8. Push button [ESC].
6.7.9 Set a Time Path
1. Get the E-Link Manual Controller (page 6-2).
2. Push [ESC] or [
] to wake up the E-Link.
3. Stop all timed actions (page 6-13).
4. In the main menu of the E-Link, select
Routes and push [ ].
5. Select time path and push [
].
Refer to the time path description.
Note:
The JUNO 150 must not drive more than 40% of the total time in a time path.
It must spend minimum 60% of the total time charging at the charging
station.
6. Push soft button [New].
7. Push soft button [>].
8. Push [
] to select the start time (hour) and push soft button [>].
9. Push [
] to select the start time (minutes) and push soft button
[>].
10. Push [
] to select the route and push soft button [>].

Table of Contents

Other manuals for LELY JUNO 150

Related product manuals