EasyManua.ls Logo

LELY JUNO 150 - Install the Earthing

LELY JUNO 150
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-8 Installation
D-I012.1109EN
innovators in agriculture
4. Connect the 12 V cable (6) to the electrode assembly with the two
M6 bolts:
1. Connect the lead of the brown (or red) cable to the (+)
terminal (5).
2. Connect the blue (or black) cable to the (-) terminal.
Note:
Make sure the cable is minimum of 2 cm (0.8 in.) from the side.
5. Connect the cable to the frame with self-adhesive cable ties.
Figure 28. Install the battery charger
5.4.5 Install the Earthing
Parts
Bolt M6x16
Nut M6
Shake-proof washer A6.4
3 Self-adhesive cable ties.
Installation
1. Find the ground wire of a nearby secure grounding pin.
Note:
You can also use the grounded part of a cubicle, a feed fence or a barn frame.

Table of Contents

Other manuals for LELY JUNO 150

Related product manuals