EasyManua.ls Logo

LELY JUNO 150 - Page 58

LELY JUNO 150
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-2 Installation
D-I012.1109EN
innovators in agriculture
1× Electrode assembly (5)
2× Brackets (4)
8× M8 bolts and lock nuts (9), (10)
1× Battery charger with power supply cable and 12V battery cable
(packed separately) (2)
2× M6 bolts
1× Cover (6)
1× Grounding cable (11)
3× Self adhesive cable ties (12)
cable ties.
Make sure the following parts are available in the packaging for the
inductive metal guiding strips:
3× Metal guiding strip (1.5 m (4.9 ft)) (7)
12× Split nail 6×35 mm (8).
Figure 23. List of supplied parts

Table of Contents

Other manuals for LELY JUNO 150

Related product manuals