Maintenance work on the carrier
7.3 Engine
7 - 22 3 302 364 en Maintenance manual
GMK 4100L-1
25.11.2016
After checking/
cleaning
• Remove all tools and cleaning equipment.
• Check that the grille (4) and enclosure plates (5) are secure.
• Start the engine and wait until the fan impellers are rotating.
• Check that the fan impellers are running freely.
• Check the respective temperature displays in the driver's cab;
à Operating Instructions.
• Switch the engine off.
• Check the radiator and connections for leaks.