EasyManua.ls Logo

Manitowoc Grove GMK 4100L-1 - Page 211

Manitowoc Grove GMK 4100L-1
356 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance work on the carrier
7.17 Electrical system
25.11.2016
Maintenance manual 3 302 364 en 7 - 123
GMK 4100L-1
Before checking
Switch off the battery master switch (1).
Open the cover on the battery box.
Checking the acid concentration
Batteries without covers (1) are maintenance-
free.
Remove all caps (1).
Read off the cell value on the acid siphon (2)
and compare the value with that in the table;
à Charge level table, p. 7 - 122.
Check all cells in the same way.
Tightly bolt on all covers (1).
After checking
Close the cover on the battery box.
Switch the battery master switch (1) on.
Check the timers on the tachograph and the
auxiliary heater;
à Operating Instructions.
Enter the code for the radio; à Separate
engine operating instructions, provided by the
manufacturer
.

Table of Contents

Related product manuals