Maintenance work on the superstructure
8.5 Slewing bearing
8 - 24 3 302 364 en Maintenance manual
GMK 4100L-1
25.11.2016
Checking the
outer ring
Divide the checking of the 72 screws into 18 working steps of 4 screws
each (1).
Between each of the 18 operation steps you need to rotate the turntable
to the next group of 4 screws on the opposite side.
Switch the engine off after every rotation and secure the truck crane
against unauthorised use;
à p. 2 - 3.
Check the tightness of the first group of 4 adjoining screws (1);
à Torques, p. 8 - 23.
Once they have been checked, mark the screws to avoid subsequent
confusion.
Remove the tool.
Start the engine (from the crane cab) and turn the turntable by 180° – the
second group on the opposite side is now accessible.
Switch the engine off.
Check all other groups in the same way.
Checking the
inner r
ing
Divide the inspection of the 71 screws into 35 work steps with 2 screws
each and 1 work step with 1 screw.
Between each of the 35 operation steps you need to rotate the turntable
to the next pair of screws on the opposite side.
Switch the engine off after every rotation and secure the truck crane
against unauthorised use;
à p. 2 - 3.
Check the tightness of the first pair of screws (1) and (2) on the opposite
side;
à Torques, p. 8 - 23.
Mark the screws that have been checked, to avoid confusion later.
Remove the tool.
Start the engine (from the crane cab) and turn the turntable by 90° – the
second pair of screws on the opposite side is now accessible.
Switch the engine off.
Check all other screws in the group in the same way.