EasyManua.ls Logo

Manitowoc Grove GMK 4100L-1 - Page 5

Manitowoc Grove GMK 4100L-1
356 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Additional pages for maintenance manual 3 302 584 en 3
GMK 4100L-1
24.04.2017
1.2 Main boom
1.2.1 Check/lubricate the telescoping cylinder
Consult the Maintenance manual supplied for information on prerequisites,
and observe the safety instructions outlined in Chapter
Main boom.
Familiarise yourself with the slinging points for personal safety
equipment on the GMK 4100L-1 truck crane;
à Operating manual.
Grease, Tools
–Brush.
Feeler gauge.
Prerequisites The truck crane must be level.
The hook block must be unreeved.
The main boom must be completely retracted and lowered into horizontal
position.
A rigging mode must be created with a telescope status that satisfies the
lifting capacity table necessary for maintenance;
à Lifting capacity table;
Section
Telescoping sequences for lubricating the main boom.
The RCL code for the current rigging mode must be entered.
Personal safety equipment to secure you from falling is used;
à Operating manual.
s
M 12
Designation GROVE part no.
PAL1 lubricant paste, 25 kg bucket 02314698

Table of Contents

Related product manuals