Maintenance overview
5.2 Maintenance plans
5 - 18 3 302 364 en Maintenance manual
GMK 4100L-1
25.11.2016
5.2.11 Maintenance plan Y 10
Y 10
Maintenance work on the CARRIER:
every 120 months/after 200,000 km (124,000 mi)
Steel construction
Check the load-bearing steel construction. For further information, please
contact
Manitowoc Crane Care.
Maintenance work on the SUPERSTRUCTURE:
every 120 months/after 12,000 oper. hrs.
Electrical system
Have the battery on the electronics board replaced
à p. 8 - 74
Steel construction
Check the load-bearing steel construction. For further information, please
contact
Manitowoc Crane Care.
Rated capacity limiter (RCL)
Have the RCL checked by
Manitowoc Crane Care.