Maintenance overview
5.4 Measures required for winch monitoring
25.11.2016
Maintenance manual 3 302 364 en 5 - 27
GMK 4100L-1
The used proportion S
2
of theoretical service life after the second inspection
is therefore:
Remaining theoretical service life:
D2 = 3,040 h -1,920 h = 1,120 h.
The above values are entered in the table (see table example p. 5 - 28).
3. inspection (3rd year)
The truck crane was used for assembly work and occasional unloading work
on docks: Load spectrum: L 2,
i.e. Km
3
= 0.25.
The operating hours counter for the main hoist reads 940 h, i.e. during this
period: 940 h - 6
40 h = 300 h. T3 = 300 h.
The used proportion S
3
of theoretical service life after the third inspection
is therefore:
Remaining theoretical service life:
D3 = 1,120 h - 600 h = 520 h.
The values are entered in the table
(see table example p. 5 - 28).
The remaining theoretical service life i
s
to be documented in a separate
table for each winch.
This table is to be attached to the crane logbook. This table is to be found in
the maintenance man
ual's appendix for truck cranes that do not require a
crane logbook or similar documentation according to the regulations of the
respective country.
s
S
i
0,5
0,125
---------------
480 hï‚´ 1,920 h==
S
i
0,25
0,125
---------------
300 hï‚´ 600 h==

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 4100L-1 and is the answer not in the manual?

Manitowoc Grove GMK 4100L-1 Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 4100L-1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals