Maintenance work on the carrier
7.8 Axle lines
7 - 54 3 302 719 en Maintenance manual
GMK6300L-1
13.02.2018
4th axle line
• Place a receptacle under screws (2) and (3).
• Remove screws (1), (2), (3) and (4) and
let the oil drain off.
• Fit new gaskets and tighten the screws (2)
and (3).
• Fill the oil up to the lower edge of the
opening (1).
• Fit new gaskets and tighten screws (1)
and (4).