Running-in regulations
4 - 2 3 302 719 en Maintenance manual
GMK6300L-1
13.02.2018
Operating hours
(oper. hrs.)
Additional maintenance work on the
SUPERSTRUCTURE
after 50
Tighten the clips on the coolant hoses;
à Special torques, p. 10 - 2.
during the first 100 Check the hydraulic oil filter every week, and
change it if necessary;
à Oil filter 1 – cleaning the magnetic rod, p. 8 - 68,
à Changing the hydraulic oil filter, p. 8 - 73.
after 100 Tighten the bolts on the slewing bearing;
à Checking the screws, p. 8 - 53,
à Special torques, p. 10 - 2.
after 100 Hook blocks;
à Lubricating, p. 8 - 109.
after 200 First oil change on the hoists;
à Changing the oil/checking the oil, p. 8 - 44.
after 1000 or after
12 months at the latest
Second oil change on the hoists;
à Changing the oil/checking the oil, p. 8 - 44.
after 200 Change the slewing gear oil;
à Changing the oil/checking the oil, p. 8 - 50.
after 250 Change the engine oil;
à Engine manufacturer’s documentation.