7
2 Setup
No. 99MBC122A
2
Setup
2.1
Unpacking and checking items included
When unpacking for the rst time, check that the following components are contained in the box.
Name Quantity Part No.
LGH gage head 1 -
Signal connection cable 1 -
EH Counter (dedicated to LGH) 1 -
Spanner (for replacing the contact point) 1 538610
Rubber foot 4 -
Stand (for EH Counter) 1 -
Washer (for EH Counter) 6 -
AC adapter 1 357651
AC adapter power cable (for use in Japan and
other countries)
1 02ZAA000
DC plug (MP-121M) 1 214938
Inspection report 1 -
User's Manual (this document) 1 99MBC122J (Japanese)
99MBC122A (English)
Warranty 1 -
The LGH gage head, signal connection cable, and EH Counter should have the same serial number.Please
make sure that they have the same serial number. Connecting parts with dierent serial numbers may lead to
gage failure, and accuracy cannot be guaranteed.