© Munters AB, 2020 30
6
Minimum and Maximum
Ventilation
The following sections detail how to configure the minimum and maximum ventilation
levels by growth day. As the temperature rises above the target temperature, Trio
gradually increases ventilation level using a combination of increased fan speeds, cycle
times, opening the inlets and more.
•
Building Structure Summary
•
Defining Basic Ventilation
6.1
Building Structure Summary
In a typical setup, flocks are housed in a building in which all rooms are connected to one
central ventilation system. Each room has an inlet which controls the amount of air
entering. Centralized fans push air in via the inlet.
Outside air is pushed into the attic; the controller maintains the required pressure in the air
duct. By adjusting the air inlet, each room independently controls the amount of air
entering. As temperature rises, the inlets’ opening increases.