EasyManua.ls Logo

Omron NX-EIC202 - A-6-2 Application Procedure

Omron NX-EIC202
430 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A - 55
Appendices
NX-series EtherNet/IP Coupler Unit Users Manual (W536)
A-6 Connecting to Masters from Other Manufacturers
A
A-6-2 Application Procedure
The following table gives the application procedure and support software.
A-6-2 Application Procedure
Step Item Description Support Software
1 Preparing for Work Selecting NX Units
Checking the Specifications of the EtherNet/IP
Coupler Unit and NX Units
Checking the Mounting Direction
Designing the Power Supplies for the Ether-
Net/IP Slave Terminal
---
2 Making Hardware Set-
tings and Wiring the
Slave Terminal
Switch Settings
Installing NX Units
Wiring
---
3 Setting the IP Address
and Clock of the Ether-
Net/IP Coupler Unit
Setting IP Address
Setting NTP Server
Support software from other
company
4 Setting Slave Terminal
Configuration and
Operation Settings
*1
*1. For details on the settings, refer to 9-2 Setting Slave Terminal Parameters on page 9-7.
Creating the Unit Configuration Information
Setting the I/O Allocation Information
Unit Operation Settings
Setting Unit Application Data
NX-IO Configurator
*2*3
*2. The NX-IO Configurator can be used with NX-EIC202 version 1.2 or later. Otherwise, the Sysmac Studio must
be connected to the peripheral USB port on the EtherNet/IP Coupler Unit.
*3. If a Safety Control Unit is connected, the Sysmac Studio Standard Edition must be connected to the peripheral
USB port on the EtherNet/IP Coupler Unit.
5 Transferring and Com-
paring EtherNet/IP Cou-
pler Unit Parameter
Settings
*4
*4. For details on the settings, refer to 9-3 Transferring and Comparing Settings on page 9-28.
Transferring the Unit Configuration Information
Transferring the I/O Allocation Information
Transferring the Unit Operation Settings
Transferring Unit Application Data
Verifying Settings
NX-IO Configurator
*2*3
6
IO-Link Settings
*5
*5. This setting is required only when an IO-Link Master Unit is connected.
IO-Link Device Settings
CX-ConfiguratorFDT
*6
*6. The CX-ConfiguratorFDT can be connected via Ethernet if NX-EIC202 version 1.2 or later is connected. Oth-
erwise, it must be connected to the peripheral USB port on the EtherNet/IP Coupler Unit.
7 Setting Tag Data Links Creating Tag Data Links
Determining RPIs and Timout Values
Adjusting Network Load
Support software from other
company
8 Assigning Network Vari-
ables
*7
*7. For details on the settings, refer to 9-6 Assigning Network Variables on page 9-71.
Creating the I/O Mapping
NX-IO Configurator
*2*3
9
Checking Indicators
*8
*8. For details on the specifications, refer to 4-2 Indicators on page 4-5.
Checking EtherNet/IP Coupler Unit Indicators
Checking NX Units Indicators
Troubleshooting
NX-IO Configurator
*2*3
Support software from
other company
10 Confirming Operation
by Checking the Wiring
Checking Wiring with Input Monitoring and
Forced Outputs
Support software from other
company
11 Programming Creating the User Program Support software from other
company

Table of Contents

Other manuals for Omron NX-EIC202

Related product manuals