EasyManua.ls Logo

Perkins 2800 - Operation 11-3 to Test

Perkins 2800
158 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
106 Workshop Manual, TSD3450E, Issue 1
2800
To test Operation 11-3
Use a suitable test rig and diesel fuel to test the fuel transfer pump.
1 Run the pump at 2940 rev/min. The flow at 650 kPa (94 lb/in
2
) must be 4,5 litres/min (1.0 UK gall/min).
2 Run the pump at 840 rev/min. The flow at 550 kPa (80 lb/in
2
) must be 3,0 litres/min (0.66 UK gall/min).
3 Run the pump at 100 rev/min with the inlet to the atmosphere for 10 seconds. The pump must maintain a
vacuum of 60 kPa (9 lb/in
2
) for 30 seconds when the inlet is blocked.
If the pump cannot achieve the figures given above, it must be renewed.

Table of Contents

Related product manuals