Operating Manual DTT 6801 Multicontroller (MC) 086100037 © Pfannenberg GmbH Page 45 / 49
5.5 Maintenance checklist template
Cooling unit maintenance checklist
Maintenance interval: Conduct maintenance every twelve months.
Conduct maintenance every two to six months in oil-
and dust-laden environmental air.
Type:
Serial number:
Date of maintenance:
Technician carrying out the work (name):
Unit range designation/
Required maintenance tasks
System before maintenance
General visual inspection of the system
Inspection for corrosion damage
Inspect refrigerant-carrying parts for traces of
oil
Inspect refrigerant-carrying parts for tightness
Inspect electrical connections for damage
Inspect evaporator for ice formation
Condenser / heat exchanger
Inspect pipe package for deposits
Inspection for general corrosion damage
Inspect, clean, align fins*
Evaporator / heat exchanger
Inspect pipe package for deposits
Inspection for general corrosion damage
Inspect, clean, align fins*
Inspect mount for loose parts
Inspect the electrical connection for damage
Check motor bearings for noises
Check the drive for signs of overheating
Evaporator fan (internal)
Inspect mount for loose parts
Inspect the electrical connection for damage
Check motor bearings for noises
Check the drive for signs of overheating
* Maintenance intervals are more frequent, depending on the degree of contamination.