EasyManua.ls Logo

Planet GS-5220 Series - Page 210

Planet GS-5220 Series
568 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Users Manual of GS-5220 LCD Series
210
VLAN Group VID Untagged Members Tagged Members
VLAN Group 1 1 Port-7 ~ Port-52 N/A
VLAN Group 2 2 Port-1,Port-2 Port-3
VLAN Group 3 3 Port-4,Port-5 Port-6
Table 4-1: VLAN and Port Configuration
The scenario is described as follows:
Untagged packet entering VLAN 2
1. While [PC-1] transmit an untagged packet enters Port-1, the Managed Switch will tag it with a VLAN
Tag=2. [PC-2] and [PC-3] will received the packet through Port-2 and Port-3.
2. [PC-4],[PC-5] and [PC-6] received no packet.
3. While the packet leaves Port-2, it will be stripped away it tag becoming an untagged packet.
4. While the packet leaves Port-3, it will keep as a tagged packet with VLAN Tag=2.
Tagged packet entering VLAN 2
5. While [PC-3] transmit a tagged packet with VLAN Tag=2 enters Port-3, [PC-1] and [PC-2] will received
the packet through Port-1 and Port-2.
6. While the packet leaves Port-1 and Port-2, it will be stripped away it tag becoming an untagged
packet.
Untagged packet entering VLAN 3
1. While [PC-4] transmit an untagged packet enters Port-4, the switch will tag it with a VLAN Tag=3.
[PC-5] and [PC-6] will received the packet through Port-5 and Port-6.
2. While the packet leaves Port-5, it will be stripped away it tag becoming an untagged packet.
3. While the packet leaves Port-6, it will keep as a tagged packet with VLAN Tag=3.
For
this example, VLAN Group 1 just set as default VLAN, but only focus on VLAN 2 and
VLAN 3 traffic flow

Table of Contents

Related product manuals