6. TROUBLESHOOTING
This chapter contains information to help you solve issues. If the Managed Switch is not functioning
properly, make sure the Managed Switch was set up according to instructions in this manual.
â–  The Link LED is not lit.
Solution:
Check the cable connection and remove duplex mode of the Managed Switch.
â–  Some stations cannot talk to other stations located on the other port.
Solution:
Please check the VLAN settings, trunk settings, or port enabled/disabled status.
â–  Performance is bad.
Solution:
Check the full duplex status of the Managed Switch. If the Managed Switch is set to full duplex and the
partner is set to half duplex, then the performance will be poor. Please also check the in/out rate of the
port.
â–  Why the Switch doesn't connect to the network.
Solution:
1. Check the LNK/ACT LED on the switch.
2. Try another port on the Switch.
3. Make sure the cable is installed properly.
4. Make sure the cable is the right type.
5. Turn off the power. After a while, turn on power again.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Planet GS-5220 Series and is the answer not in the manual?

Planet GS-5220 Series Specifications

General IconGeneral
BrandPlanet
ModelGS-5220 Series
CategorySwitch
LanguageEnglish

Related product manuals