EasyManua.ls Logo

Pulsar ULTRA 5 - Page 166

Pulsar ULTRA 5
258 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 158
Pump Duty
Description
3= Alternate duty assist
All pumps are used to assist each other
(run at the same time). Each pump has
its own setpoints, (P213, 223, 233, 243,
253 & P214, 224, 234, 244, 254) but
each time all pumps have stopped, the
setpoints are sequentially rotated
between the pumps to ensure equal
pump use.
4= Alternate duty backup
If a pump fails to meet the demand (due
to malfunction, intake blockage etc.),
then it is stopped and another pump shall
take over. Each pump has its own
setpoints, (P213, 223, 233, 243, 253 &
P214, 224, 234, 244, 254) but each time
all pumps have stopped, then the
setpoints are sequentially rotated
between the pumps to ensure equal
pump use.
5= Duty backup and assist
First pump comes on, if it cannot cope,
it goes off and next pump comes on
(duty backup). This continues until the
last pump comes on and if it cannot cope
the first pump comes back on to assist
the last pump (duty assist) if the level
continues to rise all other pumps will
come on (assist) in turn until the level
decreases to the pump off points. Each
pump has its own setpoints, (P213, 223,
233, 243, 253 & P214, 224, 234, 243,
253).

Table of Contents

Other manuals for Pulsar ULTRA 5

Related product manuals