EasyManua.ls Logo

Raven Envizio Pro - Page 34

Raven Envizio Pro
287 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
P/N 016-0171-493 Rev. I 19
Installation
Cable Platforms and Connections
Two cable platform options are available for use with the Envizio Pro field computers. Each platform offers a
range of optional features which can be added to the control system at any time.
Generation 1 Cable Connections
Important: Ensure that the Envizio Pro field computer has been properly mounted and all component cabling is
connected properly before connecting the Envizio Pro to power.
FIGURE 3. Generation 1 Main Interface Cable Connection Diagram
1. Route the conduit with red and white leads to a clean, controlled power source such as a clean power bus
bar or junction box.
NOTICE
Please review the Raven CANbus Network
Installation Manual for installation instructions
for the specific cable platform being installed
with the field computer prior to beginning
installation. Contact a local Raven dealer for
assistance or to purchase additional
components necessary to set up the CANbus
system.
+12V DC
GND
Auxiliary
Power Output
3 Amps Max.
Ext. Switch
+12V Switched
Console
DGPS
CANbus
To Field Computer
Main Interface Port

Table of Contents

Other manuals for Raven Envizio Pro

Related product manuals