Connect Copy
94
3
Connect Copy Job Flow
The job flow depends on the status of
the two machines.
When One of the Two
Machines is Idle
One of the machines is copying Orig-
inal A.
Using the idle machine as the main
machine (Connect Copy)
A
AA
A
Make Connect Copy settings for
Original B on machine <2> (the
idle machine).
B
BB
B
Machine <2> begins copying
Original B. Machine <1> also
starts copying Original B when it
has finished with Original A.
1.
Sub-machine
2.
Main machine
Using the machine currently copying as
the main machine (Connect Copy: Job
Preset)
A
AA
A
Make Connect Copy settings for
Original B on machine <1> (the
machine currently in use).
KHCONR1E
KHCONRBE
KHCONR3E
KHCONR2E
MartiniC2_EN_Copy-F1_FM.book Page 94 Tuesday, July 27, 2004 1:43 PM