Roche Diagnostics
F-34
Operatorโs Manual ยท Version 3.4
14 ISE operation Cedex Bio analyzer
Replacing ISE fluid bottles
Interpreting the bottle status
screen
4
Press Cal or Ref.
A screen is displayed that shows details about the bottle status.
5
Press .
A screen is displayed, asking you to scan the bottle barcode or to type it manually.
6
Scan the bottle barcode.
7
Press .
8
Observe the messages on screen and react accordingly.
If the barcode cannot be read, type it manually.
When the scanning process is finished, a message is displayed, asking you to
replace the bottle.
9
Open the ISE cover.
10
Remove the tubing adapter by lifting it and placing it on a clean lint-free tissue.
11
Remove the bottle.
12
Remove the cap of the new bottle.
13
Place the new bottle.
14
Insert the tubing adapter.
15
Close the ISE cover.
16
On the screen, press to confirm the placement.
The system performs the Prime ISE Reference and Calib. maintenance action.
17
Press to close the screen for reading barcodes.
Allow at least 15 seconds for priming the ISE bottle before continuing with any
other activity.
Fluid bottle empty, or no fluid registered by an ISE fluid sensor. (Operation
has stopped.)
You need to replace the bottle now.
The fluid level in the bottle is low. (Operation will proceed until one of the
sensors detects that there is no fluid.)
The fluidโs expiration date has passed.
You should replace the bottle as soon as possible.
No action is required.
Make sure to place a full bottle.
You need to perform a main calibration before you can process orders.