Roche Diagnostics
F-60
Operatorโs Manual ยท Version 3.4
15 ISE maintenance Cedex Bio analyzer
ISE maintenance actions
Installing the tubing Install the tubing in the reverse order of removing it.
11
Pull the new tubing set over the pump head, with the connector plate facing the
electrode block.
12
Align the tubing connector plate with the tube connectors on the ISE unit.
13
Carefully close the peristaltic pump lid.
The tube connector plate is automatically pushed into the tube connectors of the
ISE unit.
14
Close the ISE cover.
15
Press to confirm completion of the action.
The system first performs the Prime ISE Reference and Calib. maintenance
action, then Initialize ISE Unit.
A message will inform you when the maintenance actions are complete.
16
Remove the Activator from the sample area.
17
Press .