EasyManuals Logo

Roche Cedex Bio User Manual

Roche Cedex Bio
558 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #510 background imageLoading...
Page #510 background image
Roche Diagnostics
F-60
Operatorโ€™s Manual ยท Version 3.4
15 ISE maintenance Cedex Bio analyzer
ISE maintenance actions
Installing the tubing Install the tubing in the reverse order of removing it.
11
Pull the new tubing set over the pump head, with the connector plate facing the
electrode block.
12
Align the tubing connector plate with the tube connectors on the ISE unit.
13
Carefully close the peristaltic pump lid.
The tube connector plate is automatically pushed into the tube connectors of the
ISE unit.
14
Close the ISE cover.
15
Press to confirm completion of the action.
The system first performs the Prime ISE Reference and Calib. maintenance
action, then Initialize ISE Unit.
A message will inform you when the maintenance actions are complete.
16
Remove the Activator from the sample area.
17
Press .

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Roche Cedex Bio and is the answer not in the manual?

Roche Cedex Bio Specifications

General IconGeneral
BrandRoche
ModelCedex Bio
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals