EasyManua.ls Logo

Rockwell Automation Allen-Bradley POINT Guard - Page 143

Rockwell Automation Allen-Bradley POINT Guard
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rockwell Automation Publication 1734-UM013J-EN-P - July 2014 143
Replacing POINTGuard I/O Modules Chapter 8
5. Verify that the Network Status (NS) status indicator is alternating red/
green on the correct module before clicking Yes on the confirmation dialog
box to set the SNN and accept the replacement module.
6. Follow your company-prescribed procedures to functionally test the
replaced I/O module and system and to authorize the system for use.
Scenario 2 - Replacement Module SNN Is Different from Original and Safety Signature Exists
1. Remove the old I/O module and install the new module.
2. Right-click your POINT Guard I/O module and choose Properties.
3. Click the Safety tab.
4. Click Reset Ownership.
5. Click OK.
6. Right-click your module and choose Properties.

Table of Contents

Related product manuals