Commissioning
8.2 Commissioning the 3KC8 transfer switching equipment
Manual, 08/2017, L1V30368969104A-02
141
Commissioning the 3KC8 transfer switching equipment
After the 3KC8 transfer switching equipment has been connected to the main circuits, and
the control circuits have been successfully connected according to type and source, you can
commission the transfer switching equipment.
● The transfer switching equipment is in the "Manual" position
Figure 8-6 Switch in "Manual" position
● The handle is in the O position
Figure 8-7 Handle in the "O" position
● All cable lugs / busbars have been properly mounted
Figure 8-8 Fastening the cable lugs / busbars