PROFIBUS DP Communication Module
SIRIUS 3RW44 manual
8-18 GWA 4NEB 535 2195-02 DS 06
Prerequisites for commissioning
Table 8-2: Prerequisites for commissioning
Required actions For further information, refer to ...
1. The soft starter is installed Chapter 3 "Installation, Connection
and Branch Layout" on Page 3-2
2. The PROFIBUS DP communication module is
installed
Chapter 8.3 "Installation of the
PROFIBUS DP Communication
Module" on Page 8-7.
3. The station address is set on the soft starter Chapter 8.4.3 "Activating the
PROFIBUS DP Communication
Module (Field Bus Interface) and
Setting the Station Address via the
Device Interface using the "Soft
Starter ES Premium" or the "Soft
Starter ES + SP1" Software" on
Page 8-13.
4. The soft starter has been configured
(configured and parameterized)
Chapter 8.5 "Soft Starter
Configuration" on Page 8-15
5. The supply voltage for the DP master is
switched on
DP master manual
6. The DP master is switched to the operating
state RUN
DP master manual