EasyManua.ls Logo

Siemens SITRANS FUS380 - Meter Setup; A.4 Meter Setup

Siemens SITRANS FUS380
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A.4 Meter setup
Table A-4 Meter setup parameters
Parameter Default val‐
ue
Value
range
Access
level
Description
Meter Setup
307 Flow velocity offset 0 m/s -10 to 10 m/
s
HW key Velocity added to measured flow velocity
310 Calibration factor 1.0 0 to 2 R/W This calibration factor will be calculated at
the factory with wet-calibration.
For FUS080-SONOKIT (retrofit) installations
this parameter should be calculated by the
pipe geometric tool (see "Pipe geo. assis‐
tant" in "Device" menu)
311 Adjustment Factor 1 - 2 to 2 R/W Meter correction factor for customer adjust‐
ment of the calculated flow value. Can be
used at installations where a reference meter
is used to get reference to the true flow rate
312 Sensor cable length Product de‐
pendent
0 to 200 m R/W Cable length (m) from sensor to transmitter
372 Filter time constant Product de‐
pendent
0 to 100 s R/W General time filter for flow measurement. Fil‐
ter constant is the time that must pass before
the filter's ouput value is at 70% of the
change of its input value. Higher number
gives a slower and more stable flow signal.
373 Low flow cut-off Product de‐
pendent
0 to 10 R/W If the flow comes below this percentage of
Qmax, then the flow value is set to zero
374 Creep lock max number 10 0 to 20 R/W Alternative cut-off for totalizing and pulsing.
If the totalized flow within this number (N) of
samples exceeds [(N x Qmax x low flow cut
off)/100], the amount is accepted for pulsing.
ΣQ > N x Qmax x low flow cut-off/100
ΣQ: totalized flow within N samples
N: Creep lock max number
380 Protect linearization from
user access.
No No, Yes Read Protection of the linearization parameters. It
is decided by the order number and cannot
be changed.
The linearization parameters are listed in the
device menu "Linearization"
Totalizer
400 Flow direction totalizer 1 Forward Forward,
Reverse,
Net
R/W Calculation principle on flow direction for for‐
ward, reverse or net flow
401 Totalizer 1 change date Last change
date
dd-mm-
yyyy;
hh:mm:ss
Read Date and time when totalizer 1 function was
changed
410 Flow direction totalizer 2 Reverse Forward,
Reverse,
Net
R/W Calculation principle on flow direction for for‐
ward - reverse or net flow
Parameter lists
A.4 Meter setup
SITRANS FUS380/FUE380
106 Operating Instructions, 05/2018, A5E00730100-AE

Table of Contents

Related product manuals