Commissioning
10.2 Introduction to commissioning
SITRANS P DS III with PROFIBUS PA
166 Operating Instructions, 06/2013, A5E00053276-07
10.2
Introduction to commissioning
Following commissioning, the transmitter is immediately ready for use.
To obtain stable measured values, the transmitter needs to be allowed to warm up for five
minutes or so after the power supply is switched on. Upon switch-on, the transmitter goes
through an initialization routine (display at the end: "Init done"). If the transmitter initialization
routine does not complete, check the auxiliary power.
The operating data must correspond to the values specified on the nameplate. If you switch
on the auxiliary power, the transmitter will operate.
The following commissioning cases are typical examples. Configurations different from those
listed here may be meaningful depending on the system configuration.