Commissioning
10.4 Differential pressure and flow rate
SITRANS P DS III with PROFIBUS PA
172 Operating Instructions, 06/2013, A5E00053276-07
To commission the transmitter for gases, proceed as follows:
1. Open both the shut-off valves
⑥ at the pressure tapping point.
2. Open the stabilizing valve
②.
3. Open the differential pressure valve (
③ or ④).
4. Check and if required correct the zero point when the start of scale value is 0 mbar.
5. Close the stabilizing valve
②.
6. Open the other differential pressure valve (
③ or ④).
Commissioning for liquids
the differential pressure
the
differential pressure transducer
Gas collector vessels (optional)
,
Differential pressure valves
Differential pressure transducer