EasyManua.ls Logo

SUNSTONE CDDP-A - Chapter 2: Setup and Installation Guide; Safety and Workspace Requirements; Power Requirements and Weld Actuation

SUNSTONE CDDP-A
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Questions? Call or Text +1-801-658-0015 • 5
e Micro Welder Experts
Chapter 2: Setup and Installation
Safety
Carefully read the Sunstone Safety and Basics booklet that accompanied this welder prior to operation.
As the operator of this welder, you assume responsibility for your safety and those around you.
Carefully read the user guide that accompanied your weld head or hand piece.
Before pressing the foot pedal and triggering a weld, make sure nothing is obstructing the electrodes,
other than the work piece being welded.
If maintenance or setup is required, put the welder in a “Weld O” state, or turn unit o before adjusting
weld head.
WORKSPACE CONSIDERATIONS
Ensure workspace around the power supply is adequate for welding operation.
Ensure enough clearance on both sides and back of power supply for cables to run.
Good ventilation is important to keep the power supply from overheating. Be sure to have proper air
ow in and around the power supply.
Be sure to keep the work surface stable, level, free of vibration, and strong enough to support the power
supply.
Ensure the power supply is mounted the proper distance from the weld head, and incoming power.
Avoid placing the power supply near sources of high frequency radiation.
Keep the working area clear of excessive dust, acids, corrosive gases, salt, and any moisture.
VOLTAGE AND POWER REQUIREMENTS
The Sunstone CDDP-A welder is equipped with universal power supplies and can be used with either 110VAC
or 220VAC. No voltage selection is required prior to connecting and powering on the welder. The welder will
automatically detect the voltage and make the appropriate adjustments automatically.

Table of Contents

Related product manuals