EasyManua.ls Logo

Suzuki DF 40 - Page 152

Suzuki DF 40
405 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-9 POWER UNIT
INTAKE MANIFOLD
Install intake manifold assembly.
(See page 6-2)
FINAL ASSEMBLY CHECK
Perform the following checks to ensure proper and safe opera-
tion of the repaired unit.
All parts removed have been returned to their original posi-
tions .
Lower unit gear engagement is properly adjusted.
(See page 9-22)
Fuel and water hose routing match’s service manual illustra-
tion. (See page 10-7 to 10-9)
Wire routing match’s service manual illustration.
(See page 10-2 to 10-6)
No fuel leakage is evident when fuel system is pressurized.
(See page 5-3)
No water leakage is evident during final test running.

Table of Contents

Other manuals for Suzuki DF 40

Related product manuals