EasyManua.ls Logo

Suzuki DF 40 - Page 225

Suzuki DF 40
405 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8-15 POWER TRIM AND TILT
Apply Water Resistant Grease to the PTT rod upper shaft 4,
then insert the shaft through the swivel bracket and tilt rod.
99000-25160 : Water Resistant Grease
Secure the upper shaft with the snap ring 5.
Route the PTT motor cable in through the lower cover and con-
nect the terminals to the PTT relays.
(Cable routing–see the WIRE / HOSE ROUTING section on
page 10-2 to 10-6.)
l

Table of Contents