EasyManua.ls Logo

Suzuki DF 40 - Page 51

Suzuki DF 40
405 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-25 PERIODIC MAINTENANCE
16. When finished with the O
2
feedback operation, disconnect
the diagnostic harness Black and Red lead wires.
17. If retrying feedback operation , repeat procedure used in
steps “6” and “9” through “16”.
NOTE:
Repeat the O
2
feedback operation with a new O
2
sensor if :
The total feedback operation finished without returning the
throttle to a fully closing position.
The total feedback operation failed repeatedly.
B
The O
2
sensor is only used when performing the O
2
feedback operation.
After O
2
feedback operation is completed the original
plug must be installed in the oil pump case.
18. Assembly is reverse order of disassembly.
Red
Black

Table of Contents

Other manuals for Suzuki DF 40

Related product manuals