EasyManua.ls Logo

Suzuki RM 250 2003 - Cylinder Head; Inspection after Installation

Suzuki RM 250 2003
225 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CYLINDER, CYLINDER HEAD AND PISTON 4-9
Install new O-rings
4 and
5.
Install the cylinder head.
NOTE:
Apply Bond “1207B” to the stud bolt threads when assembling
the removed stud bolts into the cylinder.
% 99000-31140: SUZUKI BOND1207B”
CYLINDER HEAD
Tighten the cylinder head nuts to the specified torque accord-
ing to the specified tightening order as shown.
$ Cylinder head nut:
Initial:15 N·m (1.5 kgf-m, 11.0 lb-ft)
Final: 25 N·m (2.5 kgf-m, 18.0 lb-ft)
Tighten the engine mounting bracket bolt. (!3-5)
Tighten the spark plug. (!2-6)
INSPECTION AFTER INSTALLATION
Route the cables and hoses properly. (!19-12 to 14)
Pour engine coolant. (!2-11)
Check the throttle cable play. (!2-13)

Table of Contents

Related product manuals