EasyManua.ls Logo

Suzuki RM 250 2003 - Installation; Primary Driven Gear

Suzuki RM 250 2003
225 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CLUTCH 5-7
INSTALLATION
Install the clutch assembly in the reverse order of removal. Pay
attention to the following points.
PRIMARY DRIVEN GEAR
Apply transmission oil to the spacer
1 and needle bearing
2.
Fit the clutch sleeve hub
3, new lock washer
4 and clutch
sleeve hub nut
5.
NOTE:
The flat side of the nut must face outside.
Tighten the clutch sleeve hub nut with the special tool to the
specified torque.
" 09920-53740: Clutch sleeve hub holder
$ Clutch sleeve hub nut: 90 N·m (9.0 kgf-m, 65.0 lb-ft)
Bend the lock washer
6 to secure the nut.

Table of Contents

Related product manuals