5. INSTALLATION
The S-80 should be installed on a level and vibraon-free foundaon. Leave enough space
around the table for operaon and maintenance.
- Engineers wrench 46 mm, 36 mm, 27 mm
- ER 25VM
Fasten the machine on oor with chemical anchor bolts M16 through machine base
plate, secure with M16 nuts. Check machine straightness with a spirit level (or a digital
level), adjust with leveling bolts if needed.
The oor under this machine must stand the weight of 1000kg / anchor foot.
Anchor bolt and leveling bolts. Floor plate xing: Use chemical anchor bolts M16, Würth
W-VD or equivalent. Anchor bolt holes, Ø18. Secure with M16 nuts.
Check the horizontal straightness of the S-80 collaring machine from the Z-carriage
slides,using a spirit level. The maximum tolerance is 1 mm/m. Adjust if necessary.
5.1. AMBIENT CONDITIONS
The machine must be placed in an working area, the environmental condions of which
do not exceed the following limit values:
Temperature: +12,5 °C…+ 40°C
Relave humidity of air: 75% or less
Electromagnesm
The surrounding appliances should not cause such
electromagnec perturbaons which exceed the
general standards established for workshop machinery.
Altude: max. 2200m