EasyManuals Logo

TECO TP03 PLC User Manual

TECO TP03 PLC
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #127 background imageLoading...
Page #127 background image
Instruction list
7-1
Chapter 7 Instruction List
1 Basic sequential instruction
Mnemonic Function Circuit Step
[LD]
Initial logical operation contact
type NO (normally open)
1
[LDI]
Initial logical operation contact type
NC (normally closed)
1
[AND]
Serial connection of NO (normally
open) contacts
1
[ANI]
Serial connection of NC (normally
closed) contacts
1
[OR]
Parallel connection of NO (normally
open) contacts
1
[ORI]
Parallel connection of (normally
closed) contacts
1
[LDP]
Initial logical operation -Rising edge
pulse
2
[LDF]
Initial logical operation Falling/
trailing edge pulse
2
[ANDP]
Serial connection of Rising edge
pulse
2
[ANDF]
Serial connection of Falling /trailing
edge pulse
2
[ORP]
Parallel connection of Rising edge
pulse
2
[ORF]
Parallel connection of Falling / trailing
edge pulse
2
[ANB]
Serial connection of multiple contact
circuits
1
[ORB]
Parallel connection of multiple contact
circuits
1
[MPS]
Stores the current result of the internal
PLC operations
1
[MRD]
Reads the current result of the internal
PLC operations
1
[MPP]
Pops (recalls and removes) the
currently stored result
1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TECO TP03 PLC and is the answer not in the manual?

TECO TP03 PLC Specifications

General IconGeneral
BrandTECO
ModelTP03 PLC
CategoryController
LanguageEnglish

Related product manuals