TSC 900 TRANSFER SWITCH CONTROLLER
PM 151 REV 5 16/04/19 Thomson Power Systems
5.10.4. PHASE ROTATION REVERSED 78
5.10.5. RATED GENERATOR POWER 78
5.10.6. CT RATIO (CURRENT TRANSFORMER) 78
5.10.7. PT RATIO (POTENTIAL TRANSFORMER) 78
5.10.8. LOAD NAME 79
5.10.9. SOURCE 1 (UTILITY) NAME 79
5.10.10. SOURCE 2 (GEN) NAME 79
5.10.11. APPLICATION MODEL 79
5.10.12. SWITCH OPERATION 79
5.10.13. SWITCH MODEL 79
5.11. OPTION SETTINGS 79
5.11.1. SRC 2 (GEN) COMMIT TO TRANSFER 79
5.11.2. ENABLE LOAD SHED ON UNDER FREQUENCY 80
5.11.3. ENABLE LOAD SHED ON OVER POWER 80
5.11.4. HALT OPERATION ON PHASE REVERSAL 80
5.11.5. MANUAL SRC 1 (UTILITY) RETRANSFER CONTROL 80
5.11.6. FORCE TRANSFER 81
5.11.7. GHC SLEEP MODE TIMEOUT 81
5.11.8. LOAD POWER METERING 81
5.11.9. MODBUS RTU 81
5.11.10. MODBUS TCP/IP 82
5.11.11. ENABLE SECURITY BYPASS 82
5.11.12. ENABLE NEUTRAL DELAY BYPASS 82
5.11.13. ENABLE TRANSFERS TO SRC 1 (UTILITY) 82
5.11.14. ENABLE TRANSFERS TO SRC 2 (GENERATOR) 83
5.11.15. ENABLE FAIL TO AUTO SYNC ALARM 83
5.11.16. ENABLE HALT TRANSFER ON FAIL TO EXTERNAL SYNC CHECK 83
5.11.17. ENABLE CLOSED TRANSITION TRANSFER (CTTS MODEL 3 & 4) 83
5.11.18. REVERT TO OPEN TRANSITION 84
5.11.19. ENABLE FAIL TO UNLOAD ALARM (CTTS MODEL 4) 84
5.11.20. ENABLE EXTENDED PARALLEL MODE (CTTS MODEL 4) 85
5.11.21. ENABLE SOFT-LOAD TRANSFER (CTTS MODEL 4) 85
5.11.22. ENABLE START OF MULTIPLE GENS WHEN RESUMING FROM STANDBY 85
5.11.23. PREFERRED SOURCE ALTERNATION INTERVAL 86
5.11.24. TRIP UTILITY (SRC 1) WHEN CLOSED TRANSITION INHIBIT ACTIVATED 86
5.11.25. CURRENT METERING 86
5.11.26. ENABLE OPEN TRANSITION IN-SYNC TRANSFER (ATS MODEL X) 86
5.12. DELAY SETTINGS 87
5.12.1. UTILITY (SRC 1) RETURN DELAY 87
5.12.2. GEN (SRC 2) COOL DOWN DELAY 87
5.12.3. GEN (SRC 2) START DELAY 87