EasyManua.ls Logo

THOMSON TSC 900 - Editing Existing Exercise Schedule Event

THOMSON TSC 900
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TSC 900 TRANSFER SWITCH CONTROLLER
PM 151 REV 5 16/04/19 Thomson Power Systems
64
Once in the Scheduler Editor page, select desired Exercise type (on load or off load),
then select desired Exercise schedule (i.e. period, reoccurrence, start time, stop time,
end date, end time and exercise duration).
5.7.2. EDITING EXISTING EXERCISE SCHEDULE EVENT
From the GHC Home Page, navigate to the GHC “SchedulerPage, select desired
schedule (row) to be edited, then select EDIT button on the selected item as shown
below;
Once in the Scheduler Editor page, select desired Exercise type (on load or off load),
then select desired Exercise schedule (i.e. period, reoccurrence, start time, stop time,
end date, end time and exercise duration).

Table of Contents

Related product manuals