EasyManua.ls Logo

THOMSON TSC 900 - Transfer Halted Alarm Reset

THOMSON TSC 900
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TSC 900 TRANSFER SWITCH CONTROLLER
PM 151 REV 5 16/04/19 Thomson Power Systems
55
4.13. TRANSFER HALTED ALARM RESET
Should a transfer switch failure occur during a transfer to a new intended source, a TRANSFER
HALTEDalarm will be posted to the GHC home screen as shown below. The transfer switch
will remain in this current position until the Transfer Halted condition is manually reset by ATS
operator utilizing the RELEASE TRANSFER reset button on the GHC home page.
NOTE:
The TRANSFER HALTED condition will be initiated by one of the
following operating conditions:
- Power Switching Device fail to close or open
- Reverse Phase Rotation between connected sources
- Phase unbalance alarm

Table of Contents

Related product manuals