CLCH-SVX07K-EN 23
Installation - Mechanical
Lifting and Rigging
Remove Shipping Tie-Downs
Prior to unit placement, remove the shipping tie-
downs.
Shipping tie-downs are located at each corner of the
isolation base.
Figure 5. Remove shipping tie-downs
Figure 6. Shipping tie-down - rear view
Tiedown
Tiedown
Clearance
Clearance
Tie-down removal
Figure 7. Shipping tie-down - front view
Figure 8. Isolator tie-down for unit sizes 3-8
Tie-down removal
Required
clearance
Tiedown